Thursday 24 October 2013

Works-like prototype nearly finished

We're really excited that our works-like prototype is nearly ready for testing.   It's been built locally by Model Products who've helped us work through the integration of the components.   It will comprise the membranes, beads, nanomister and flush.  This version made out of perspex so it will be easy to observe each process, but we're also working on an aspirational design.


Keep following ther blog to see this prototype being tested in our lab very soon, and the beautiful design.

Monday 21 October 2013

Dewatering in action

Here's the membrane rig working at full power, pulling water out of a synthetic urine solution. In this case it's coming through fast as both liquid and vapour, and then going through a cold trap where we can capture it all and make measurements.

Thursday 17 October 2013

Three generations of mister

We've now developed the latest mister unit and lining the three up together shows just how far we've come!


The lastest desgin (the far left) has been 3D printed, but could be injection moulded for mass production.